當前位置:首頁-資訊中心>行業(yè)新聞標志樁在操作方面需要注意什么

標志樁在操作方面需要注意什么

來源:http://m.yncls.com/ 發(fā)布時間:日期:2022-09-07 0
標志樁在操作方面需要注意什么?這個問題值得來了解,畢竟只有充分對其認識,才能避免很多問題的發(fā)生存在,下面就讓燃氣標志樁生產(chǎn)廠家為您講解一番吧。
What should be paid attention to in the operation of marker piles? This problem is worth understanding. After all, only by fully understanding it can we avoid the occurrence of many problems. Let the gas marker pile manufacturer explain it for you.
1.測量放線的基準點一定要,其中放線基準點是指設(shè)計控制樁和水準基樁。
1. The datum point for surveying and setting out must be, in which the datum point for setting out refers to the design control pile and benchmark pile.
2.一定要按照圖紙的作業(yè)要求設(shè)置控制樁,一定要表明樁號、里程、地面標高、轉(zhuǎn)角高度等數(shù)據(jù)。
2. The control piles must be set according to the operation requirements of the drawings, and the pile number, mileage, ground elevation, corner height and other data must be indicated.
3.在定測資料和平面或是斷面圖紙上表明地下的障礙物,其次是,要保證線路和地下構(gòu)筑物交叉兩側(cè)的控制范圍為3米,同時,須要設(shè)置警告牌和標志樁。標志樁上須要寫上相關(guān)的數(shù)據(jù)。比如:埋深,交叉尺寸等。
3. Indicate the underground obstacles on the location survey data and plan or section drawings. Secondly, ensure that the control range on both sides of the intersection of the line and underground structures is 3M. At the same time, set warning boards and sign piles. Relevant data shall be written on the sign pile. For example: buried depth, cross size, etc.
4.關(guān)于劃線方面,要根據(jù)軸線和標志樁的界限之間拉一根繩子,撒上白石灰劃線。完成劃線,要清理現(xiàn)場的障礙物。
4. As for the marking, a rope shall be pulled between the axis and the boundary of the marker pile, and white lime shall be sprinkled for marking. After the marking, clear the obstacles on the site.
5.關(guān)于移樁方面,是在劃線完成之后打掃清理之前,將所有需要的線管樁平移到土堆的旁邊,范圍控制住。
5. As for the pile moving, after the marking is completed and before cleaning, all the required pipe piles shall be moved to the side of the soil pile, and the range shall be controlled.
燃氣標志樁
準備工作很重要:
Preparation is important:
1、詳細查看研究放線區(qū)域的完整的施工作業(yè)圖紙。
1. Check the complete construction drawings of the study setting out area in detail.
2、提前準備交樁記錄需要的表格及了解接樁組成人員便于溝通。
2. Prepare the forms required for pile delivery records in advance and understand the pile extension personnel for communication.
3、準備符合要求的測量儀器、木樁、標筆、白石灰以及其他工具。
3. Prepare measuring instruments, stakes, markers, lime and other tools that meet the requirements.
4、將需要測量放線使用的工具進行矯正,還需要保證這些工具須在規(guī)定的有效期范圍之內(nèi)。
4. Correct the tools to be used for surveying and setting out, and ensure that these tools are within the specified period of validity.
標志樁在操作方面需要注意什么?以上從幾個方面來講解了問題,希望能夠給您好的幫助,更多注意事項可以來我們網(wǎng)站http://m.yncls.com進行咨詢并提問。
What should be paid attention to in the operation of marker piles? The above explained the problem from several aspects. I hope I can help you. For more precautions, please come to our website http://m.yncls.com Consult and ask questions.