供水标识桩_管道警示带_电缆警示桩_地埋标志桩_燃气标志桩_燃气管道警示带_可探测地埋式警示带_地埋示踪线-滨州恒通电力器材有限公司

歡迎來(lái)到濱州恒通電力器材有限公司網(wǎng)站,我們竭誠(chéng)為您服務(wù)

公司新聞
當(dāng)前位置:首頁(yè)-資訊中心>公司新聞燃?xì)夤艿谰編У穆裨O(shè)要點(diǎn)三方面講起

燃?xì)夤艿谰編У穆裨O(shè)要點(diǎn)三方面講起

來(lái)源:http://m.yncls.com/ 發(fā)布時(shí)間:日期:2022-06-24 0
1、溝渠開挖
1. Trench excavation
混凝土路面和瀝青路面的開挖應(yīng)使用切割機(jī)進(jìn)行切割。
The excavation of concrete pavement and asphalt pavement shall be cut by cutting machine.
管道溝應(yīng)按設(shè)計(jì)規(guī)定的平面位置和標(biāo)高開挖。采用人工開挖且無(wú)地下水時(shí),槽底預(yù)留值應(yīng)為0.05~0.10m;管道安裝前應(yīng)人工清底設(shè)計(jì)標(biāo)高。
The pipe trench shall be excavated according to the plane position and elevation specified in the design. When manual excavation is adopted and there is no groundwater, the reserved value at the bottom of the trench shall be 0.05~0.10m; Before pipe installation, the bottom shall be manually cleaned to the design elevation.
溝底的寬度和工作尺寸應(yīng)根據(jù)現(xiàn)場(chǎng)實(shí)際情況和鋪設(shè)管道的方法確定。
The width and working size of the trench bottom shall be determined according to the actual situation on site and the method of laying pipes.
局部超挖部分應(yīng)回填壓實(shí)。溝底無(wú)地下水時(shí),超挖0.15m以內(nèi),可用原土回填;如果超挖在0.15以上,可以使用石灰土。當(dāng)溝底有地下水或大量積水時(shí),宜采用級(jí)配碎石或天然砂回填標(biāo)高。超挖部分應(yīng)回填后壓實(shí),壓實(shí)度應(yīng)接近原地基天然土的壓實(shí)度。
Local over excavation shall be backfilled and compacted. If there is no underground water at the bottom of the ditch, the original soil can be used for backfilling within 0.15m of over excavation; If the overbreak is more than 0.15, lime soil can be used. When there is underground water or a large amount of ponding at the bottom of the ditch, graded crushed stone or natural sand should be used for backfilling to the elevation. The over excavated part shall be backfilled and compacted, and the compaction degree shall be close to that of the natural soil of the original foundation.
濕陷性黃土區(qū)不宜在雨季施工,或施工時(shí)應(yīng)有效溝內(nèi)積水。開挖時(shí),溝底應(yīng)預(yù)留0.03~0.06m厚的土層進(jìn)行壓實(shí)處理。
The construction in the collapsible loess area should not be carried out in the rainy season, or the ponding in the ditch should be effectively removed during construction. During excavation, 0.03~0.06m thick soil layer shall be reserved at the bottom of the ditch for compaction.
當(dāng)溝底有廢棄構(gòu)筑物、硬石、木材、垃圾等雜物時(shí),必須,并鋪設(shè)一層厚度不小于0.15m的沙土或素土、平整、壓實(shí)和設(shè)計(jì)用于高程。
When there are waste structures, hard stones, wood, garbage and other sundries at the bottom of the ditch, they must be removed, and a layer of sand or plain soil with a thickness of not less than 0.15m must be paved, leveled, compacted and designed for elevation.
軟土地基和特殊腐蝕性土按設(shè)計(jì)要求處理。
Soft soil foundation and special corrosive soil shall be treated according to design requirements.
管道警示帶
2.回填土壤
2. backfill soil
(1)不得使用凍土、垃圾、木材和軟質(zhì)材料進(jìn)行回填。管道兩側(cè)及管頂以上0.5m內(nèi)回填土不得含有碎石、磚塊等雜物,不得回填石灰土。離管頂0.5m以上的回填土中石子不得超過(guò)10%,直徑不得大于0.1m,并應(yīng)分布均勻。
(1) Frozen soil, garbage, wood and soft materials shall not be used for backfilling. The backfill at both sides of the pipeline and within 0.5m above the pipe top shall not contain debris, bricks and other debris, and shall not be backfilled with lime soil. The stones in the backfill soil 0.5m above the pipe top shall not exceed 10%, the diameter shall not be greater than 0.1M, and shall be evenly distributed.
(2)溝槽支撐應(yīng)在管道兩側(cè)及管頂以上0.5m處回填壓實(shí),在保證的情況下拆除,縫隙應(yīng)采用細(xì)砂填平。
(2) The trench support shall be backfilled and compacted at both sides of the pipe and 0.5m above the pipe top. It shall be removed under the condition of safety. The gap shall be filled with fine sand.
(3)回填溝渠時(shí),應(yīng)先回填管底懸空部分,再回填管道兩側(cè)。
(3) When backfilling ditches, the suspended part at the bottom of the pipe shall be backfilled first, and then both sides of the pipe shall be backfilled.
(4)回填土應(yīng)分層壓實(shí)。每層厚度應(yīng)為0.2~0.3m。管道兩側(cè)及管頂以上0.5m以內(nèi)的回填土必須人工壓實(shí),離管頂0.5m以上的回填土必須人工壓實(shí)??刹捎眯⌒蜋C(jī)械壓實(shí),每層虛鋪的厚度應(yīng)為0.25~0.4m。
(4) Backfill shall be compacted in layers. The thickness of each layer shall be 0.2~0.3m. The backfill on both sides of the pipeline and within 0.5m above the pipe top must be compacted manually, and the backfill above 0.5m from the pipe top must be compacted manually. Small machinery can be used for compaction, and the thickness of each layer of virtual paving shall be 0.25~0.4m.
(5)回填土壓實(shí)后,應(yīng)逐層檢查密實(shí)度,并做好回填記錄。
(5) After the backfill is compacted, the compactness shall be checked layer by layer and the backfill records shall be made.
3.警示帶鋪設(shè)
3. warning tape laying
沿埋地燃?xì)夤艿缿?yīng)連續(xù)鋪設(shè)警示帶。在鋪設(shè)警示膠帶前,應(yīng)將鋪設(shè)面壓實(shí)并平放在管道頂部。
Warning tapes shall be continuously laid along buried gas pipelines. Before laying the warning tape, the laying surface shall be compacted and laid flat on the top of the pipe.
管道警示帶應(yīng)采用黃色聚乙烯等不易分解的材料制作,并印有明顯、牢固的警示語(yǔ),字體不小于100*100mm。
The pipeline warning tape shall be made of yellow polyethylene and other materials that are not easy to decompose, and shall be printed with obvious and firm warning words, with the font not less than 100*100mm.
以上就是問題解答的相關(guān)內(nèi)容了,希望能夠幫助到大家,如對(duì)這一問題還存在任何疑問,都?xì)g迎關(guān)注我們網(wǎng)站http://m.yncls.com并咨詢我們的工作人員,將竭誠(chéng)為您服務(wù)。
The above is the relevant content of the question answer. I hope it can help you. If you still have any questions about this problem, you are welcome to follow our website http://m.yncls.com And consult our staff, will serve you wholeheartedly.

相關(guān)產(chǎn)品 / Related products

  • 地釘

    地釘

  • 地釘

    地釘

  • 警示樁

    警示樁

  • 警示樁

    警示樁

截屏,微信識(shí)別二維碼